..
|
..
|
Re: roll cage question
A little confused what's the questiin
|
Re: roll cage question
For some reason im not able to delete . It doesn't matter now anyway . It is back at the house strike 2 on chassis builders .
|
Re: roll cage question
OK , I have this truck , 1976 chevy luv . I have a ton of Chromemoly and no one to bend or weld it . The ladder bars and rear axle ate built . Thinking of just ordering frame rails and 12 point cage mail order and mig welding it in myself . Tired of promises. A lot of you know I drag race . I have a big portion of this truck in a pile and a good mig welder . Like $1200 worth of materials and a week we could be scaling it . Just about to do it myself . What would ya'll do in my situation . I am not opposed to buying a bender and learning to tig weld , but it would delay racing .
|
Re: roll cage question
Oh and this big tire deal would be 415 ci dart block E85 AFR heade sbc with ne 1,80 ATI glide and 9 inch with aluminum bolt through case . Good parts .....
|
Re: roll cage question
Tube bending and TIG welding are not something you are going to learn in a short time. Especially if you are working with 4130.
|
Re: roll cage question
I didn't think you were allowed to cert a Chromoly cage with MIG welds. Could be wrong but MIG was ok only in regular steel cages/bars.
|
Re: roll cage question
I think that tig welding tube is going to take you a bit longer than you hope. I took a 90 hour welding course and only did tig (and tig welded at home). I felt pretty confident by the end of the time. Then you'd still have to learn the bending and coping...
I am all for taking time to learn a new skill but not sure how long you want to wait to race. |
Re: roll cage question
Quote:
Quote:
Quote:
Monday I am going to talk to a well know builder Monday to talk about the project . He is 10-12 weeks out . |
All times are GMT -4. The time now is 10:39 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com