Quote:
mcbassin
Re: Project "Jezebel"
Nice work on the drip rails and rocker panel! Man that must have taken some serious time.
|
Thanks mcbassin, the rockers took about 6 hours. Surprisingly the drip rails only took about an hour and a half each.
Steve
__________________
69 CST-10 SWB (disguised as a 67) 383/700r4
Jezebel
Jezebel 3.0 NEW!!!
2020 GMC 3500 Denali Duramax
2016 Harley Street Glide CVO
Roll Tide!