Re: Double drop builds
Next up was to strip the rear to get ready to c notch the rear and install the 4 link. Basically the crossmembers wher removed near the rear where the notch goes in. You get tired of cutting rivits after a wile. Also it was braced in front and behind the rear to hold the frame during the notch cutting and welding. I decided to go with the 4 link setup. I just liked it better than the trailing arm setup.
Posted via Mobile Device
|