View Single Post
Old 01-24-2014, 07:13 PM   #107
gclark1
Registered User
 
gclark1's Avatar
 
Join Date: Jan 2013
Location: Mesa, AZ
Posts: 161
Re: Introduction and 2wd Blazer in progress

lowrodderchev - thanks for caring!

With Christmas and New Years and a lot of vacation time, I did very little on it over the last 5 weeks.

However, this past weekend, I did get the column hung and get all of the interior stuff (ac control, radio, cluster...) bolted in that I wanted to prior to the motor and trans going in. I want the wires and such to be accessible so that if something does not work, it will be easy to get to.

At this point of the build, as many warned me it would be, I spend so much time and accomplish very little that you can actually see.

I did decide to paint the core support and top of the radiator all body color and will be doing that this weekend. I picked up my 700 transmission from the shop that built it and need to get it all painted up too, but not installed yet.
Attached Images
 
gclark1 is offline   Reply With Quote