Re: 71 4X4 Frame off Restoration
Saturday I spent some time installing the Dirty Dingo motor mount in the frame. Sunday I cut loose the rear roof section from the tack welds and cut it in half as it was about 1/4" short from side to side. I fit and tack welded the 2 sections in place with a gap about 1/4" wide in the middle. spent the rest of the day moving part around and cleaning up my garage. I also moved the frame over so I can have more room to work in the drive way.
Not able to upload picture today tried several times
|