View Single Post
Old 01-27-2016, 05:15 PM   #162
ibrown50
Registered User
 
ibrown50's Avatar
 
Join Date: Nov 2013
Location: Stanley Co' Durham UK
Posts: 535
Re: Ian's Tennessee Honey '64 Short Box Step-side - England

I've been speaking to Rian this afternoon, he has been busy making brake pipe flares and I have been busy drilling holes. Oh the joys of truck building

So by way of a quick up-date, I have made the first of the strengthening plates for the trailing arms, as mentioned above I wanted to avoid seam welding the sides and try to create a more factory spot weld / rivet look.

Even with simple jobs such as this the marking out is all important. The U-bolt holes are 7/8" giving me 1/8 clearance, the spring cup hole is 5/8" giving me about 1/16 clearance. The weld holes are just over 3/8" (actually 11mm) at 4" centres, the idea is to plug weld these in place giving a spot weld / rivet appearence (I'll let you know how that works out ).

Below is a picture of the first one, it needs a little more fettling and then it should be good to weld in place. The 2 lower ones will be longer, about 28", upper ones will be about 24"

Name:  Trailing arm reinforcer.jpg
Views: 453
Size:  50.8 KB

Name:  Trailing arm mockup.jpg
Views: 448
Size:  52.4 KB
__________________
Getting old sucks.............but it sure beats the alternative
ibrown50 is offline   Reply With Quote