That is all for last weekend folks. The list is getting very short for starting to move the 68 body over! Here is my list (so far):
- Drill holes and mount passenger side frame reinforcement plate.
- Paint back half of frame
- cut and flare brake line that was removed.
- Install the brake line...
- reinstall oil cooler line
- flush power steering box.
- reconnect pitman arm
As always, I'll see more as I get in to it but it is starting to look promising!
Thanks for checking in folks!
-Richard