View Single Post
Old 08-19-2018, 04:47 PM   #16
Dyslexic Dog
Registered User
 
Join Date: Jul 2018
Location: GR MI
Posts: 57
Re: 59 Apache project 2018

I have already pulled the motor at my old shop. New garage will have a twin post hoist. I also have the MIG welder but I'm looking at TIG too. That stuff will be for later. I want to get the drive train set first. I'm sick of sliding under a vehicle on a creeper.
Dyslexic Dog is offline   Reply With Quote