View Single Post
Old 05-17-2012, 08:48 AM   #112
68Stepbed
Registered User
 
68Stepbed's Avatar
 
Join Date: Mar 2005
Location: 10-Uh-See
Posts: 5,609
Re: Project: LS1ick68

Nothing major happening lately, but I did get a little bit done yesterday evening. I removed the wires from the weatherpack connector on the MSD wiring harness and fed them through the existing hole in the firewall then reattached them inside the cab. I'll find a place inside the cab to mount the MSD controller later. I'll mainly work out the ball of spaghetti in the engine bay first.

I torqued down the trans crossmember and trans mount, then measured the length to have my driveshaft cut down.

Lastly, I finally got around to changing out the old CPP 1" front drop springs for the new ECE 2" drop springs. Sorry, no pics yet, but, wow, 1" of drop makes a big difference!! (Yes, the 1" drop springs will be up for sale.)

I'll try to finish cleaning up the wiring, install the MSD box, reinstall the intake, and finish up some other odds and ends this weekend, then try to take the driveshaft to get cut and take the headers to get coated next week.
__________________
Matt

68 C10 stepside, LS1/700R4, TCI Engineering suspension system
68Stepbed is offline   Reply With Quote