Back to the wheel well rust repair: Hit inner areas of surface rust with POR15 then prepped for patch panel installation.
Lord Fusor 108B is neat stuff. Pretty easy to work with, 40-50 minutes of work time, 4 hours to full cure.
Prepped for exterior patch
Need to pull last pictures from phone showing exterior patch installed.
Panels are solid. I'm happy with results. Putting the fender flare on today and moving to the passenger side soon. Progress.