View Single Post
Old 03-15-2018, 05:08 PM   #42
Jferrante
Registered User
 
Jferrante's Avatar
 
Join Date: Jan 2015
Location: Arlington VA
Posts: 359
Re: Project 66: LS and Frame on the Ground

Nothing dramatic has changed we got a lot of snow and I lost power for 2 days and I am traveling for work so I didnt get much work done this past weekend. Regardless I am making slow and steady progress.

I got the 4 link brackets welded to the rear axles which was a nice accomplishment. It is an awkward welding angle for someone new to the craft but I got it done. Added the rear bags as well.

Up front the holes for the ball joints in the spindles werent wide enough so I had to drill them out to the right sizing without over enlarging the hole.
I then got the shocks mounted, steering rack in and my front wheels mounted up as well as my airbags.

Next up is running some air lines and my trans mounts and hopefully getting the air all powered up and ready for the engine.
Jferrante is offline   Reply With Quote