I have taken some pictures of my progress. Got the toe kick welded in and it fits well. I painted all the areas that will be closed up with POR-15. Since it takes a little while to dry I think I am done for the day.
This shows how everything is lining up. I used the blue tape when the door was hitting the rocker panel. The tape scraped easy when the door touched.
[IMG]
[/IMG]
This is the front view of panels in place
[IMG]
[/IMG]
Picture of the toe kick in place and the weld ground and painted to prevent short term rust
[IMG]
[/IMG]
Outside view of toe kick
[IMG]
[/IMG]
[IMG]
[/IMG]
That last one is a taste of the direction of the build. Yes that is a 4th door hanging there. It will swing suicide. Once I get that one set up correct I will do the other back door to match.