Re: Halfbreed - GMC Z71 + IH Extd Cab
Did the B pillar/floor blends.
Got one of the two mid-cab mounts re-welded. Boy do I NOT enjoy overhead welding. (Not helped much by the unclean metal down there...) I just keep chanting "die-grinder, sealer, bondo" over and over again!
But it (and the other 15 feet of floor welding) will hold until the day off in the future when I pull the cab and do a proper clean and re-weld.
I also started cleaning and prepping some of the light housings. I was trying to figure out why the IH designers thought it was a good idea to paint the interior of the brake/sig lights black. Eventually I decided they weren't thinking so I'm going ahead and painting them gloss white on the inside because I want the energy from the light to get OUT of the light housing.
|