View Single Post
Old 05-27-2017, 11:31 PM   #839
MP&C
Registered User
 
MP&C's Avatar
 
Join Date: Jan 2013
Location: Leonardtown, MD
Posts: 1,634
Re: 55 Wagon Progress

Pilot hole drilled for the passenger B-Pillar.....





The center point is spring loaded, but they seem to locate better using a pilot hole vs. just a punch...














The plug weld holes drilled for the anchor and paint cleaned off in prep for welding..





Apprentice E worked on smoothing off the plug welds from last week..








Welding in the anchor .....








For the lower anchor point, which will hold both the retractor and the lap belt, we used some 14 ga that will be plug welded to the back side of the inner quarter panel just behind the B Pillar.. A 1/2" lock nut is welded to the back side, and a spacer added to the front side to keep the lap belt off the side wall.

















Or the motion picture version.... Thanks to duallyjam for stepping in for hand model duties in the video...


https://www.youtube.com/watch?v=4na-...ature=youtu.be
__________________
Robert
MP&C is offline   Reply With Quote