May 2017 - This ended up being kind of a cool intersection with the LVLs and their brackets.


Loft floor joists framed in.


An overall look from the new doorway.


The ground was graded and prepped for the base gravel for the concrete.


Base gravel was spread and then these were dug.....


For these in ground scissor lifts


Holes dug a little deeper and cleaner


July 2017 - All formed up and ready for the first load of concrete. The concrete was done in three different stages. The pits will be poured separately from the rest of the floor and the patio will be poured last.




Another milestone complete!




Day of the main floor pour!