Week 29 – I modified the transmission cross support bracket by cutting out the center section, flipping it over and welding it back together. I then installed the gas tank and began the arduous task of installing the fuel and brake lines (the lines were all original, but I had to modify them because of the motor being moved back 5”, the frame lengthened 9” and the new bed mount was a little in the way). It is not done yet, but after 5 hours of struggling with it, I had to take a break, if you know what I mean.