I had a shop built yesterday. It's 24 X 25 with 12 foot eaves. The concrete was poured a month ago. Concrete slab has 20" wide X 16" deep footings with rebar. There's an area in the right bay with rebar and thicker concrete to support an automotive lift that I'll get later this year.
The 3 man crew arrived about 8:30am and worked until 9:30 with only one 20 minute break for lunch. They were very dedicated to get it done and they did a terrific job. Polite and good craftsmanship with lots of checking things with levels and tape measurements. I was amazed they finished it the same day.
TIME LAPSE VIDEO LINK
SHOP TOUR