Quote:
Originally Posted by cornerstone
Any word on your displaced project?
|
No word, still sitting at the shop I took it to once I got busted for the mess I made on the roof. I think he will get started on it in about 2-3 weeks. He is going to do the LS swap and cut/weld the frame for me too. Once it comes out (assuming my trans and motor are ok) it should be ready for finishing up the bed floor, tailgate, bumper, etc., drilling the bed for trim, and other body work (both lower doors, back of DS cab corner) to get it ready for paint. Unless I have to wait a long time to get it in my Dads garage I will leave it at that before paint.
If it takes a long time to get it up to PA to paint, I still need to install the lower suspension, install vintage air, build the speedo, and throw on some wheels.