I flipped the valve covers side to side and that worked ok till I put the air cleaner on. I cut the air cleaner snorkel (and stove pipe valve to fit and maybe I will just put on a nice shiny one.
IMG_8334 by
Joe Doh, on Flickr
IMG_8335 by
Joe Doh, on Flickr
bolted the battery box in and fixed all the plug wires (they had come off whilst cherry picking. hooked up everything on the firewall and bobs your uncle.
IMG_8336 by
Joe Doh, on Flickr
trial fit of the pedals, with my wife as a helper. seat is permanent now, slides back and forth like a champ
IMG_8323 by
Joe Doh, on Flickr
IMG_8322 by
Joe Doh, on Flickr
waste not want not. flipped the section of the floor with the shifter hole with some creative measuring.
IMG_8337 by
Joe Doh, on Flickr
IMG_8338-1 by
Joe Doh, on Flickr
IMG_8340 by
Joe Doh, on Flickr
gas pedal needed some wrangling (re-angling)
IMG_8339 by
Joe Doh, on Flickr
more to come!