Couldn't post any new pics this weekend. We had an ice storm and lost power for a couple days.
Set the forms for the foundation walls. Again I didn't do the forms.
Walls poured and forms knocked down.
These bolts are 28" long and go all the way into the footing. They are for the shear wall.
Ready to backfill all the concrete.
Have all the dirt backfilled and now need more.
Had lots of 5/8 minus delivered to fill under the slab.
Lots of gravel to spread.
Gravel spread and compacted. Ready for more concrete.
Slab is poured. Very hot this day. Needed to keep it wet so it wouldn't crack.