Re: Project Snowball- Slow build
Work on the truck has been kinda slow lately. I finally got the front drop on. I am going to try and get the frame and cab to the body shop friday. If I can't do friday then I will shoot for the first of the week. Will have to pull the cab once I get it there. I still have to pull the tanks and do some minor removing of a few brake hoses and grind off a couple of exhaust hangers that were welded to the frame.
Going to try and have the blasting guy just do a wash over the frame to get all the loose stuff and grease build up off of it. I am not going to blast the whole frame down to bare metal. Behind the cab and the engine compartment needs it the most. I already power washed it once and knocked alot of it off.
|