View Single Post
Old 02-18-2017, 12:40 AM   #56
72cs20
Senior Member
 
Join Date: Jul 2014
Location: Los Gatos, Ca.
Posts: 407
Re: Project daily drivable 62 C20

A little more progress these past few weeks with the Vintage air system and the fuel injection wiring harness. Started off with the VA.

Two boxes were delivered, about 60 pounds combined -
Name:  AC1.jpg
Views: 730
Size:  21.7 KB

Here is the main unit that goes in the cab -
Name:  AC2.jpg
Views: 710
Size:  44.4 KB
Name:  AC3.jpg
Views: 718
Size:  52.3 KB

Before it goes in the cab, the heater and ac lines need to be installed, as well as the upper and lower mounting brackets.
Name:  ACinstall1.jpg
Views: 712
Size:  43.1 KB
Name:  ACinstall2.jpg
Views: 708
Size:  39.7 KB
__________________
1966 K20 flatbed build thread - http://www.67-72chevytrucks.com/vboa...d.php?t=768827
62 C20 build thread - http://67-72chevytrucks.com/vboard/s...d.php?t=703583
72cs20 is offline   Reply With Quote