View Single Post
Old 10-09-2014, 08:47 PM   #132
clinebarger
Senior Member
 
Join Date: May 2009
Location: Fort Worth, TX
Posts: 6,370
Re: 700R4 build thread.

Time to Install the Valve Body.

Install the Manual Link Rod as shown in the picture below.

Hand tighten the 1-2 Accumulator Housing & Auxiliary Valve body bolts.

Remove the Z-Bolt alignment stud that is closest to the shifter Comb.....It gets in the way of installing the Valve Body.

You may need help holding the Valve Body over the Case to start the Manual Link Rod into the Manual Shift Valve.

Center the Valve Body over the remaining Z-Hole alignment Stud, Slowly lower the Valve Body onto the Separator Plate Gasket.

**NOTE, Before sitting the Valve Body all the way down...Make Sure no Checkball has fallen onto the Separator Plate, You can usually hear them drop, But still check**

Start the Z-Hole Valve Body Bolt First!

Install the Forward Accumulator Feed Pipe if equipped.

Start the rest of the Valve Body bolts, Be aware of the Brackets & Hold down locations in the Pic below.

I do the TV Actuator Assembly last along with removing the other Alignment stud
Attached Images
  
clinebarger is offline   Reply With Quote