Well, the frame is now in the hands of the professionals. Here's a pic of it loaded up and ready to go. More out than in, but it traveled the 30 miles without the slightest problem. Should be ready for me Monday, I hope. Left a crossmember and most of the frame brackets with them as well -- figured they could do in minutes what it would take me hours to accomplish.
Last night I had a "new" stove delivered for the powdercoating experiment. Realized as I unloaded it in the dark that I'm gonna have to run another 220V circuit for the stove. I'm thinking about splitting it off of the existing circuit for the air compressor with some sort of "either/or" switch so both can't run at once. Right now it'd beat the heck out of having to run another circuit; the first one was a major pain.
__________________
Brent
'72 Chevy SWB stepside - [
Build Thread ]
'79 ChevMC SWB fleetside - [
Build Thread ]
'64 Chevy SWB fleetside & '66 Chevy SWB stepside (waiting in the wings...)