Today was a great day! A friend came over today around 1:30 pm and we set out to install the 400 sbc.
We first yanked the front axle that was only sitting in place. That allowed us to drop the front end down. Then got to fight the motor into place. Took a bit of urging to finally get the motor lined up and the input splines to mate with the clutch - but we got it done!
Hopefully will get some free evenings this week so I can get the motor install complete and fire it up.
After my friend left I got the front axle reinstalled and then went and unloaded a load of wood from my 69 K20.
Now I need to make a list of what I need to do to get it done - can see the light at the end of the tunnel for sure!