Few completed task this week.
Got the front sway bar hung and the brake lines bolted down. I somehow drilled the sway bar holes incorrectly initially but I fixed that fairly quickly. The front is done except for attaching the lower shocks once I get the engine and trans back in.
I also got the rear end removed. I still need to remove the rear shocks and all 4 leaf hangers. The front ones are huge and have a ton of rivets so thats gonna be a bear. The gas tank is very close to the left hanger as well. I wanted to work on that today but my wife isn't feeling well and the last thing she is gonna want to hear is a noisy air hammer.
So hopefully this week I can get the new hangers on so I can get the 12b under the truck.