View Single Post
Old 04-01-2016, 05:42 AM   #34
greengrenade
Registered User
 
Join Date: May 2012
Location: Riverside Maryland
Posts: 92
Re: Bagged 65 c10. AKA the periwinkle pile

Some more updates. Got the new upper links in for the four link. I started to fab up a crossmember to mount the links out of 2x4 tubing 3/16" wall




Decided to do a driveshaft hoop instead of step notching over the drive shaft. Made the hoop out of some scrap plate and a piece of pipe from a bag cup



Finish welded off the truck, made some gussets to compliment the trans crossmember





Started building perches to mount the front of the lower links. All 1/4" plate




Two gussets added on the underside and also boxed the rod end tabs. Finished pair



Then i welded the perches on and added a top gusset that extends all the way out above the link mounting point. It also flows into the crossmember smoothly and again compliments the gussets on the trans/4 link crossmembers. Excuse the screw drivers haha. We need two more bolts

greengrenade is offline   Reply With Quote