Re: Project 67
Bags n 5 lug rear with 1" drop block are now installed on the frame. Finally.
When piggy catches up new brake lines front to rear.3/8" Air lines with clamps to the frame. And finish blasting the cab firewall/ under the cab.
Made two plates out of a partial cross member for the center bolt as the trailing arm hole is huge compared to the 3/8 16T bolt used for the bag to secure it to the arm. Used 15/64 drill bit for a lil extra wiggle room. Fender washer n a locking washer on the head.
For you pic hounds..pics
|