Re: Project 67
Mostly installed Pwr steering gear box, and have some parts yet to install. Set of brake lines from Inline Tube, 50' 3/8" airline for the bags, some PTC fittings, and SS 3/8" clamps. Need the time to get this nightmare of lines on the frame. A lead on a different engine has been located with some surprise goodies to pickup Monday. Details and additional pics coming after it is safe in the garage. Meantime I have only two teaser pics..Enjoy
|