Re: Project Sloppy Jo.....
Got the replacement rocker box welded in today along with adding $150 back into the funds after repairing the side panel for the rocker box. Everything lined up nice on the rear panels for the rocker box. UPS showed up early so I got the front A pillar patch welded in also. Tomorrow, POR 15 the rocker box and get the floor ready for installation.
Smitty
|