View Single Post
Old 01-24-2015, 02:02 PM   #43
tristan
Registered User
 
Join Date: Sep 2013
Location: Western PA
Posts: 1,295
Re: Project Checkbook - 1971 Jimmy Custom

I've decided to replace all of the window gaskets as long as everything is apart so the windshield is also coming out. During the week the shop removed all of the top glass so that the window gaskets can be replaced. All hinges, lift gate and tailgate hardware, catches, latches, bumper strips, weatherstripping, etc. are now out of the door and gate frames to leave a clear field for primer and paint. The doors have been stripped of their glass, lifters, scrapers, fuzzies and vent window assemblies and all of that stuff is apart. I'm springing for new rubber, scrapers, fuzzies, etc. since everything is torn down.
Attached Images
     
tristan is offline   Reply With Quote