Quote:
Originally Posted by kwmech
How is the foundation being laid out?
|
The shop will be erected first and then I'm poring a 6"slab of concrete. Going thicker on the concrete thru out the pour as I'm putting a two post car lift in the shop and want to be able to move it where ever I like and not worry about the thickness of the concrete.