Iva also done a lot of small things like adding a new cpp deluxe trac bar, shock relocation kit, new springs for the rear to drop it another 2 inches and cleaning the frame and repainting it. I also am cleaning up the engine bay a bit with with new plug wires routed under the headers, new valve covers and a lot of odds and ends.
new deluxe trac bar with the springs install and shock relocation kit installed
I also made new 3 inch tail pipes because I didn't really care for the way it sounded or looked with the 2.5 tail pipes
engine bay with new valve covers, air cleaner, breather, dip stick and plug wires rerouted
and this is how it sets at the moment