Almost back up to date now.
Thursday was another full on work day, training till after 5.00pm
Dinner with Sally and Andy, then back down to the garage to do the last post and also to cut in and fit,paving stones right up around the other posts.
Complex cuts, but if done right, the results are certainly rewarding.
Happy with these.
Andy carried on with getting the tabs welded onto the last post.
For those wondering about the tabs all being on one side, it’s because in both cases, rather than doing wall plates, the posts seem a better idea, but need to go on the edge of the concrete posts and I doubt it would resist tightening those M12 bolts on the Rawl bolts, so straps behind, out of sight and side tabs should be more than enough.
Adding the side gate post back onto the upright as it was previously on the wall.
Job done.
Next week a few small bits, the. Invite some pros to quote on fitting a good, industrial roof.
.