Got some parts and started working on the merge.
I don't have enough hands to hold it in place for the picture but it lines up. Need to tack it together and grind the bottom flush. Then I'll port the flange a bit and weld it all up. I bought a second tank of argon and flow meter because it was cheaper than buying a dual flow meter.