Re: project orange crush 76 crewcab build
With the new set of holes drilled and the bare metal spots primed with some green acid etch primer I reassembled the rear suspension. I also drilled out all of the spring hangers and frame holes to 7/16th and used grade 8 hardware with steel lock nuts. The factory rivets were just bigger than 3/8 but smaller than 7/16
|