Re: Project "Hulk Jr"
I bet I spent 12 hours on the truck today. I got the front of the frame and firewall completely painted. I bent up all the brake lines and installed the brake booster. Installed the power steering gear box, steering column and mid shaft. Got the bezels cleaned up and switched over I didn't get it installed yet as I wired up the new brake switch, drilled a new hole in the pedal. Wired up the neutral safety switch, brake light switch, reverse lights and tc lock up is ready to go. I also replaced the heater control that was black with a good silver one I got front the parts truck before I sold it. The black one had been rebuilt with the cheap levers very flimsy. The silver one is all original. I also took the cables and readjusted them and lubed them up. They work good I just hope the fan switch works.
I feel like I spent all this time and didn't get a lot done. This stuff is tedious. But after typing it looks like a lot got accomplished today. I will post a few picture later.
__________________
1956 Chevy Bel Air 2 door
1956 Chevy 210 4 Door
1970 K20 LWB project the Hulk build w/Supercharged 4.8L-ly2/4L60E HULK BUILD
1970 C10 Yellow/White Deluxe LWB w/ 5.3L-LC9/6L80E
1968 K10 LWB Dark green my son calls it "THE HULK Jr" HULK JR *SOLD*
GO GO!!!
|