Re: Intro from an old Assembly Plant guy

I've got a few minutes so I thought I'd bang out a few more picture captions:

I'm referring back to these pictures:

http://www.73-87.com/7387info/Assembly%20Line.htm

Picture 8: The ELPO dip tank. This was a revolutionary painting process (at the time) where the entire vehicle was "dipped" in the primer paint. The vehicle itself was electrically charged, which opens the pores of the metal, allowing the paint to seep in. The charge is then cut off, closing the pores and the paint is trapped. The excess is literally rinsed off (with water) once the vehicle emerges from the tank, resulting in a smooth finish and excellent coverage.

I remember the process was fairly new when I started so it was probably installed in the mid to late 70's (on line 2 first, then line 1 later). The ELPO process is still in use today. In the Mishawaka (H2) plant the vehicle is actually "tumbled", end over end, in the tank to ensure all air bubbles are evacuated.

Picture 10: You can see the operator spraying a little bit of "Ziebart" type rust proofing inside the door.

Picture 11, 12: Paint shop: Nothing too revolutionary in this particular picture but it does make me think of a couple things. A) In this picture you can see the operator is spraying with a conventional spray gun. Sounds impressive but the reality is this guy could have been sweeping the floors the day before; today he is handed a spray gun and within three or four trucks he is "painting". In an attempt to modernize we actually installed an automated "turbine bell" system (Behr was the manufacturer), whereby a small cone (like a showerhead) is spun at a very high speed (ie, 20,000 rpm) and the paint is "slung" onto the vehicle. Here again, the vehicle was electrically charged, drawing the paint to the metal (you could actually see the paint turning the corners to stick on the backside) reducing overspray and waste. The only problem was that for any metallic paints it took the metal flakes and lined them all up neatly in order, changing the overall perceived color. We had to go back with a traditional reciprocating sprayer and apply a light color coat on those particular trucks to get the paint to match the standard chip.

B) You can't really see it, but in the background of those spray booths there is a "waterfall", that is, water running down the sides of the booths in sheets. The vacuum from the falling water captures the overspray, rinsing it into a holding tank where it is dried and the resulting "sludge" is disposed of; presumably in a manner befitting a hazardous waste.

C) Something else you all might not know, but which I found clever: for two tone trucks, the secondary color was actually applied first. The desired pattern (whether the inset or lower body - ZY1 = solid paint and ZY2 - ZY8 were the two tones) is then covered up with butcher paper and tape and then the primary color is applied over that. The paper is removed and VIOLA you have your two tone. Incidentally, some of you may remember the ZY7 paint scheme, where the secondary color formed a "spear" above the feature line with then curved upward at the cab back and over the roof - this paint scheme was conceived and developed by a couple "mechanics" (ie, technicians) at the Milford Proving Ground and subsequently adopted for production.

D) Lastly, you can see that wheels were received in black primer and the appropriate color (white or argent silver) was sprayed on the show surface, with no masking and allowing the overspray to flow through any openings or slots. (That's a big deal to the Corvette and/or Pontiac enthusiasts).

Pictures 13, 14, 15: Body drop: this was the most dramatic of assembly operations (...tour groups would stand and watch this for as long as you would let them). The bodies came down through an opening in the second floor which, with the high ceilings of an assembly plant, was a LONG way. A good hoist operator would let the body essentially "free fall", flying down through the floor WHOOOSH and then EEEEEK stopping just inches off the chassis. The guys on the first floor would nonchalantly install their body mounts and gently guide the cab/box onto the chassis, as though they did it every day (...which, of course, they did). Body bolts and box bolts were tightened (hopefully not crossthreaded, which happened relatively often) and the truck sent on its way, all without ever stopping the line.

I should mention the line (almost) NEVER stopped. Wrong cabs, wrong tire/wheel assemblies, heart attacks, lack of manpower, material shortages, etc, were NOT enough to stop the line. During my time on the final line I honestly don't recall that I ever personally pushed the stop button. I did, a couple times, on the chassis line in the brake area when the tooling was stretched against it's air hose and to let it go would have pulled the hose off its coupling. Other than that it was very, very rare. I also recall that the line rate was slightly faster than what was reported to central office so that, on a good day, we could actually produce more than the required number of trucks, resulting in a few "free" vehicles. The only times I remember the line stopping were due to downages in the cab shop, whereby the downstream operations ran out of bodies, and we had a tornado (once) and hung out in the basement.

Picture 16: back to the trim area, so they are skipping around a bit. Body glass and all the interior trim were installed in Trim, which for Line1 pickups was on the first floor at the south end of the building [so vehicles started with the cab shop, south end first floor, went to the second floor for paint, then back downstairs for trim, then back up to the second floor for the accumulator (body bank) and in preparation for body drop]. Most of the cute ladies, if there were any, worked in Trim (and usually had a number of extra male workers hovering around).

Picture 17, 18, 19, 20: Final line, showing headlight aim, wheel alignment and the final mainline inspection. Those headlight aimers are a mechanical device which attach to the headlamp lens with a suction cup; a small bubble level is used to adjust up/down and there is an arrangement of mirrors which set the adjustment crosscar. Typically during wheel alignment, while the man in the pit is setting the toe adjustment, the driver is busy cycling all the lights, turn signals, making sure the radio works, trying the windshield washers, etc. The vehicle engine is running during these tests so the short "walls" on either side of the line are comprised of vacuum vents which suck out the exhaust fumes.

I should mention that a number of employees were required to move all the vehicles around: not only to drive them off the end of the line (usually done by regular workers assigned to that job) but also a whole "subculture" of volunteer drivers used to shuttle vehicles back and forth to the repair and shipping areas. This was usually done by extra "utility" workers who did not have an assignment on the line for that day, by "rehab" workers who might be temporarily disabled but could drive a vehicle, and by any other derelicts and hot-n-tots that could be rounded up. This activity usually continued long after the main line had stopped and, as a source of overtime income, was a popular job for those who showed some initiative for extra income ( that is, the guys that were over-extended because they bought too many boats, snowmobiles, motorcycles, etc).

Last picture: there she is, the diamond of the Flint night sky, Chevrolet Flint Assembly, complete with that familiar red and white checkerboard water tower. At one point this was the only plant in the world producing GM Full Size Utility vehicles (back before they were known as "SUVs") and is still producing Light Duty pickups and Medium Duty trucks. The plant can be viewed from two major expressways, bordered by I-75 (to the west; running north/south) and I-69 (to the north; running east/west). My off hours activities would often take me past the plant, allowing me to smell the distinctive ELPO fumes and causing a short lived mild depression (they still have that affect). I am reminded that those stacks also emitted small globules of paint, which would stick to your vehicle in the form of small black blobs. Many people would simply have their vehicles wheeled out every year or two (which after a particularly noxious spill GM would pay for); I elected to cover my little blue stepside with a car cover thereby short circuiting that process.
__________________
Chevrolet Flint Assembly
1979-1986
GM Full Size Truck Engineering
1986 - 2019
Intro from an Old Assembly Guy: http://67-72chevytrucks.com/vboard/s...d.php?t=342926
My Pontiac story: http://forums.maxperformanceinc.com/...d.php?t=560524
Chevelle intro: http://www.superchevy.com/features/s...hevy-chevelle/