The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1967 - 1972 Chevrolet & GMC Pickups Message Board > 67-72 Chevrolet & GMC Pickups Projects and Builds

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 07-16-2019, 12:16 AM   #11
Scurry67
Registered User
 
Join Date: Jan 2018
Location: Spokane, WA
Posts: 321
Re: 67 SWB First Build

Dang tailgate is taking longer than I figured. Had an hour this weekend to cut out the handle relocate. I was hoping that the kit I bought would be a flush mounted patch but turns out it is meant to bolt in. Will possibly try to modify it or at a minimum weld it in instead of using the bolts.
Bow is definitely less noticable than before.
Name:  CD2568EE-F698-4031-9CE3-C7CE54347CE8.jpg
Views: 2017
Size:  55.8 KB
Handle relocate cutout.
Name:  B89B85F4-A617-42C1-82F1-1ACA0455E421.jpg
Views: 2053
Size:  53.0 KB
New handle location. Also a few small patches I need to finish welding from needing access with hammer and dolly.
Name:  0876B07E-7FFE-4079-ADEA-F05F20C1BAE1.jpg
Views: 1763
Size:  56.8 KB

Goal is to get this and my floor in some primer by end of summer. I'll hopefully be done working out of town by then and have more shop time
__________________
67 SWB First Build
http://67-72chevytrucks.com/vboard/s...d.php?t=777171
Scurry67 is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 03:10 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com