The new "He shed"
5 Attachment(s)
Moved about 4 years ago and have not had a shop to work out of since. I have a garage that was just big enough to put all the tools and equipment in along with my two bikes. All my parts and other stuff went in a conex. Started planning this about a year ago and shopped everything from stick framing it to metal buildings. This is what I wanted, 40X40 with 14 foot clear inside and a lean to on one side. Steel won out over a pole barn for many reasons including cost, insulation and having wood in the ground where I live. Settled on Ironbuilt steel buildings after looking at one and talking to the guy who put it up. I liked the quality and the fact he had a good looking building and got good customer support. I had quotes from two other company's and these guys were very competitive. So here is the progress to date and hope to stand up all the steel next week.
Jimmy Getting the area ready in this series and the layout of the building. |
Re: The new "He shed"
4 Attachment(s)
In this set the concrete goes in. 42 yards of concrete, 3500 pound with fibers.
Jimmy |
Re: The new "He shed"
3 Attachment(s)
The steel got here Friday the 31st. Started to lay it all out and to build up all the columns and the frame work. This takes a while and also took a bit to figure it all out. Got good drawings and set of instructions that show how some of the parts go together. There are a lot of parts in one of these and may be overwhelming to folks with out construction experience and being able to read drawings. I have all the pieces ready to be set and all the perlings and girts sorted to where they go. This should save time and ease the work when the crane gets here. When your being charged by the hour you need a good plan and plenty of help.
Jimmy |
Re: The new "He shed"
Gonna be nice...but gotta ask..42yrds of concrete?...for a 40x40...wow...how thick did you do the slab?
|
Re: The new "He shed"
Slab is 6 1/2" thick and 8" where the lift goes. Footer is 18X18 and the piers for the columns at 24" square. A bit of overkill but I don't have to worry what I put in it. There is 25 tons of rock under the slab. Another 100 tons out front. Next pour for under the lean to is 16X40 and will take only 8 or 9 yards.
Jimmy |
Re: The new "He shed"
Ahhhh....nothing like a good overkill....haha...I was doing the quick math and was going "whoa"... mine is 4in and I wish I had done it thicker...course, concrete was only about $60/yard back then
|
Re: The new "He shed"
Well its a tad over $60 now. Most the 10,000 lb lifts require 6" and that is why there is 8" where the lift goes. I had a thick floor in my last shop and I liked the solid base with the lathe and the mill mounted to it.
Jimmy |
Re: The new "He shed"
Nice planning.
The extra concrete will help with heating and cooling the shop. Will you have a lathe and mill in this shop? . |
Re: The new "He shed"
I’m in! I wish the jerkoff that did my slab had done what I paid for :(
|
Re: The new "He shed"
wow..your concrete is cheap...it was running right at $100/yd with fiber here last summer...may be cheaper now ..I havnt priced any this yr
|
Re: The new "He shed"
Looks like a nice building Jimmy. Congrats
|
Re: The new "He shed"
3500 with fibers is $150 a yard here now and $177 retail if you don't have a commercial account. Plan is to leave the lathe, mill and the surface grinder in the other garage for now. I know where there is another mill that I may get to put in the new shop. Got to recover from this build and get back to work before buying any more equipment. Richard come visit and bring a crane. I'll put you to work and buy dinner.
Jimmy |
Re: The new "He shed"
Haha...I get it now...a tad over 60/yd...as in 150/yd...
|
Re: The new "He shed"
2 Attachment(s)
Started setting steel today. This is the left side wall and the lean to. Started on this side because it has the most structure in a small area. Gives a rigid base to work out from. My process of measure 10 or 12 times in as many ways as I could to ensure the bolts were in the right spot before pouring concrete seems to have worked out. There are 32 anchor bolts in this area. All the steel fit and everything lined up.
Jimmy |
Re: The new "He shed"
Looks like you will be done before I could even get down there. Looks like it will be a nice setup when done.
|
Re: The new "He shed"
Going to rent a telehandler next week to set the high stuff. Still welcome anytime. Oysters are good this year and all I need to do is make a phone call to get em fresh right off the boat.
Jimmy |
Re: The new "He shed"
That telehandler is probably a smart move vs the crane.
|
Re: The new "He shed"
Yup after calling the local crane guys and getting the lowest price of $150 an hour and a 4 hour minimum I can rent a telehandler for a grand for a week. Will come in handy for lots of things.
Jimmy |
Re: The new "He shed"
Ok time for an update. I have been able to get a bit more steel up. Beginning to look like a building. So far the fit has been good and it is going together nicely. Some things take a bit longer with this being my first metal building project. Just for scale my buddy that has been helping me is 6 foot and 250 lbs.
Jimmy |
Re: The new "He shed"
5 Attachment(s)
Screwed up loading the pictures.
Jimmy |
Re: The new "He shed"
1 Attachment(s)
One more picture from the other side.
Jimmy |
Re: The new "He shed"
Quote:
As far as your Scale of your Buddy. Measuring :sumo: So is your building (750 lbs. and 18 foot tall)??? :lol::lol: . |
Re: The new "He shed"
Scale won't work on the weight side. The bill of lading for the delivery was over 18,000 pounds. It is about 18" at the top of the beam.
Jimmy |
Re: The new "He shed"
Just kidding on the math stuff.
I really like your shop! I know your going to enjoy this. . |
Re: The new "He shed"
Quote:
|
Re: The new "He shed"
They could always be bigger. I do have a 24X30 barn style garage also. Machine shop and motorcycles will stay in that. I have a 20 foot conex I plan to put by the side of the new shop for parts storage. I'll be 62 in April and retired from my full time job in December. I plan to use what I have to keep my self just busy enough to support my truck habit.
Jimmy |
Re: The new "He shed"
5 Attachment(s)
Have made some more progress on the new shop. Got the doors set and the bracing in what we had gotten finished on the walls to get it ready for the roof system. Had a crane here yesterday and we got the roof beams and perlings set. At the end of the day my buddy that has been helping me was very happy we were done. Everything fit well and went together with out any issues. The snow started falling as we were finishing up. This morning everything looked like a winter wonder land.
Jimmy |
Re: The new "He shed"
Coming along nicely Jimmy
|
Re: The new "He shed"
Thanks for the kind words Greg. Working hard to make this a nice place to work on my trucks and what ever else comes in the door. Most of the snow melted today. Will be in the 20's tonight so won't get an early start in the morning. Next step is to put in all the bracing for the roofing system and what else go in the walls that I could not do till the rest of the steel was up. As I do that I will work on all the bracing I will put up the rest of the steel that has to be up before the sheeting starts. I figure that will take 3 or 4 days. With the snow forecast I put off the delivery of the insulation till Monday. Hope to start the sheeting by the end of next week.
Jimmy |
Re: The new "He shed"
Looks good!
|
Re: The new "He shed"
Most of the snow is gone and it got to 50 today. Was 21 at 7 am so it was chilly when I got started today. My brother came to visit and we worked on putting the bracing in roof. Worked about 7 hours on all those brackets and braces and the building kind of looks the same.
Jimmy |
Re: The new "He shed"
loooking good. just watch for the ice on the steel if stepping out on it.
|
Re: The new "He shed"
Was really nice outside yesterday and worked on the bracing. This thing has a lot of X bracing in the back half of the building and I was able to get that all completed. Down to 2 pieces in the front wall and 2 in the roof of the lean to. Did find out I was short 2 pieces for the roof framing. They are about 5 foot long that are at each corner. Going to call on that this morning. Insulation is due here today.
Jimmy |
Re: The new "He shed"
2 Attachment(s)
Got all the bracing in the building and getting ready to start on the support trim around the gables and eaves that need to go up to support the roofing and siding. Did find I was missing two pieces of that and gave them a call. Very helpful and it will be here by Friday. Looks like rain for the next couple of days so progress will be slow.
Jimmy |
Re: The new "He shed"
Any updates?
|
Re: The new "He shed"
I need to get some pictures off my phone and resize them. All the bracing is done, the roof is on the lean to, I finished up everything to put the roof on the main shop and it goes on Saturday. Then on to the siding. I'll get more pictures up soon.
Jimmy |
Re: The new "He shed"
4 Attachment(s)
Here are some random pictures of where I am now with the shop. Plan is still to put the main roof on tomorrow.
Jimmy |
Re: The new "He shed"
Looking good Jimmy
|
Re: The new "He shed"
Did not get far today. Wind blew 15 to 20 with gust much higher. Will try again when the wind will let us work.
Jimmy |
Re: The new "He shed"
1 Attachment(s)
I can confirm the wind gusts. I toted this home from across the bay bridge today and the wind was so bad the GPS kept recalculating :lol:
I know I would not have been toting metal roof panels . |