Quote:
Originally Posted by lks dcvn
I only ask because everybody says to keep the top bolted on to keep the things aligned when cutting out/replacing rusty metal - well that doesn't seem to be an option at this point since the frame is rusted out pretty good so there is nothing to bolt to.
Just want to make sure I can keep this stuff lined up when I start the dismantle process over the winter for rust repair.
|
Keeping the top bolted down is basically the 'easiest' way of making sure things stay put but it's not the 'only' way to get it done accurately.
Having the correct measurements and a couple of strategically placed supports are all you really need.
Look at the skillz your building.