Re: Project "Mid Life Crisis Low Rider Burb"
I got the intake installed today and the distributer. I also got the rear shock relocator kit done too. I got the upper bag plates drilled and mounted to the bags. I cut off about 3/4 f an inch off of the lower bag cups and got them bolted up. I am waiting on the 3/4 to 1/2 ton drop spindles from ECE. They are behind on them and its holding me up from putting the nose on. I did order new inner fenders and a new cowl hood and they should be in this week. The paint shop called to see when the burb was coming? I figure 2 weeks. For those of you installing bags with the truck together many cudos! I had a heck of a time with the drilling and I had no nose on.
|