Have a few slow weeks finally, so I'm able to get some things done. I built a tower for my TC shifter.
Then I built linkage out of 2 heim joints, and some1/2"OD tube.
I still need to finish my shifter handle, and get my jack shaft built. Then I think I'm gonna work on my rear axle. I need to swap in my 3.73 posi carrier, and get it cleaned up and painted.