Well as usual you make plans to do something and it all goes to pot . We took our dogs to the woods on Friday night and unknown to us one of our staffs Harry punctured the inside of his mouth . So getting up Saturday morning to find Harry's face all swollen meant no truck time but a trip to the vet , we then find out from the vet it's an Abscess and will need an operation to drain it . So about $800 and problem solved . The good news is he is ok just a big open wound on his neck to let it drain .
So Sunday morning up early to attach the engine mounts to the crossmember the first thing was to measure the distance between the the two mounts bolted to the engine . So I bolted some studding through the mounts to get the distance between the two points
I then got some flat bar steel and drilled out the 15 inch centres to keep them straight . I had already marked the crossmember but needed to keep the in place for drilling the crossmember
The next thing will be to refit the engine and fabricate a gearbox mount