Re: 70 Chevy short stepper build

I placed my original order with Arizona Performance for my Porterbuilt stage 1 front and stage 2 rear in March of 2012. When I placed my order they had a lead time of about 6 weeks. That date came and went and all I had received to that point was the air system and other misc stuff- no PB! I contacted Travis with AZP and he checked on it to find that they were still back logged.
It was 17 weeks after the original order before my components shipped. Apparently I had placed my order about the same time that PB was expanding/ relocating(?) or some other disruption to manufacturing. This really put a damper on my progress as I needed most of the components to move forward on the frame. I also get pretty busy the last half of the year with work, so my hobby time is limited.
While I was waiting on frame parts, I figured I was safe to start painting the parts of the frame that wouldn't be modified with PB parts (wrong)!
Attached Images
    
Hendo67 is offline