Saturday we got quite a bit done. I decided that I want to mount my PCM and TAC module in the cab, so I laid out my harness, pulled the loom and tape, and rerouted wires so I can have one bundle running down the top of the transmission and I'll bring them up underneath the seats. I'll be spending some time in the evenings lengthening and shortening the wires back to the PCM connectors to clean up the spaghetti mess of wires I have now. I think what I'll have to do is label each wire for its position in the connector and pull them all out in order to sort out this mess.
We also deskinned both doors so I can take them to the sandblaster with the next batch of parts. The cab is also stripped and I'm ready to start closing up holes in the firewall, floor, and a few other spots (spotlight hole in driver's side pillar, gun rack mounting holes).
I ordered a BTR Stage 2 truck cam and springs last week so next weekend I will be swapping that out with new valve springs. My sandblaster still hasn't touched any of my chassis parts and the weather here isn't helping.