This weekend’s garage goal is to set the cab back on the frame. There were several small jobs completed in preparation. The brake system was filled with DOT 5 brake fluid and bled. I also made a set of battery cables with 1 gauge fine strand copper cable, crimped copper lugs and mil-spec terminal ends. The cables are covered with a protective spiral wrap So they should be darn near bulletproof. Both of these tasks were far easier to perform before the cab goes back on.