View Single Post
Old 12-06-2020, 10:34 PM   #59
jocko
Senior Member
 
jocko's Avatar
 
Join Date: Oct 2009
Location: Godley, TX
Posts: 17,934
Re: The build date project

I'm curious if the specific build date on the bs always ends up in the same month as the blue door sticker. i.e. how many days does it take to get down the line? The bs is done up pre-assembly as it is the guide for the line, along with grease pencil marks, etc. I don't know how far down the line the blue door tag is installed (or printed), but it's after the doors are on of course, which could be a ways down the line. In other words, if the specific date on the bs is 31 Jan 71, for instance, I'm curious of the blue door label gets printed then and travels down the line with the bs until it's stuck on the door at a later point, or perhaps at some point in Feb. Only mention because we may be mixing apples and oranges by using build sheets and blue stickers. Probably a good question for Keith!
jocko is offline   Reply With Quote