View Single Post
Old 05-10-2023, 10:35 AM   #2
A1971Blazer
Senior Member
 
A1971Blazer's Avatar
 
Join Date: Nov 2013
Location: East Tennessee
Posts: 2,107
Re: Hydro-Boost installation

you need a tool like this to insure that you have the correct depth and clearance between the end of the push rod and the piston in the MC
there should be between 1/32" and 1/16" clearance to insure that the piston is fully retracted in the MC when the brake is not applied
Name:  Replace Gauge image.jpg
Views: 421
Size:  22.5 KB
__________________
1967 C10 Step side
1968 C10 Step side
1970 Chevrolet K/5 Blazer
1972 Chevrolet K/5 Blazer
.............
A1971Blazer is offline   Reply With Quote