This weekend was beautiful 50-60 degrees made for some good work time (30 and windy again today:/) so I had a friend come over and we removed the cam bearings from the block washed out the engine with soap and water and bagged it up for later assembly
Also got the harness out of the trans and the pump and planetary all came out in one so that made for a heavy needle to thread past the stand but we got it done ordering the HD2 Trans-go shift kit this next paycheck as well as a few other small things for the engine
Last thing that got done was I went to the steel yard and got 81lbs of sheet for plating the frame fore only 16bucks gotta love that .20 cent drop steel price!